排桩地连墙施工技术
|
作者: |
单位: 天津软基技术开发公司 |
关键词: |
分类号: |
出版年,卷(期):页码:1992,16(1):44-50 |
摘要:
|
本文介绍了山西漳泽电厂取水口岸壁改造工程中无锚杆排桩地连墙的施工方法。包括施工机械、施工工序、施工工艺三部分。并着重叙述了施工过程中的有关技术问题的处理。对排桩地连墙设计和施工中应予改进的方面提出了自己的见解。
|
The paper introduced the construction technology for the diaphram wall consisting of bore-piles adopted in the cooling water intake structure in Zhangzhe Power Plant. The equipment, sequences and technology were described in certain details. The technical problems encountered during construction of such kind of diaphram were recommended.
|