摘要:
|
通过现场检测和室内分析,对运营10多年的某海港码头589根后张预应力大管桩的裂缝情况进行了全面调查,初步分析了裂缝的成因及影响因素,并进行了维修加固处理。处理结果均满足设计要求,达到预期效果,为码头的安全运行提供了保障。有关技术资料可供类似工程参考借鉴。
|
Through field test and laboratory analysis,this paper makes a complete investigation for cracks of 589 post-ten-sioned prestressing large pipe pile of some harbour wharf which has been operated for more than ten years,analyzes the causes of this action and influential factors,and makes maintenance and strengthing measures.The results of treatment are all meet de-sign requirements to obtain excellent results and ensure the safety operation of wharf.The related technology information may provide references for similar projects.
|
基金项目:
|
|
作者简介:
|
|
参考文献:
|
[1]JTJ270-98,水运工程混凝土试验规程[S].
[2]靳道斌.打桩应力及纵向裂缝的试验研究报告[R].南京:南京水利科学研究院,1987.
[3]靳道斌.预应力混凝土打桩纵向裂缝的现场试验研究[R].南京:南京水利科学研究院,1987.
[4]靳道斌,陈锦珍.箍筋间距对预应力桩打桩纵向裂缝影响的现场试验研究[R].南京:南京水利科学研究院,1981.
[5]阮起楠,宋建军.PHC管桩裂缝浅析[J].混凝土与水泥制品,1997,(1):27-29.
[6]金初阳,陈中忠华.高桩码头结构病害诊断与防治研究[R].南京:南京水利科学研究院,2000.
[7]陆锡清.浅谈大管桩裂缝的修补工艺措施[J].港口技术与管理,1997,(3):22-24.
[8]JTJ269-96,水运工程混凝土质量控制标准[S].
|
服务与反馈:
|
【文章下载】【加入收藏】
|
|
|
|